Sequenced, from the serving facility
Kits ship from the facility serving your territory (see the territory map). Delivery scope — to the site, to a staging point, in how many drops — is defined in the project agreement, not improvised at the gate.
A manufactured framing system only earns its keep if the hand-off to the site is as planned as the manufacturing. This page covers how kits travel, what your site needs before they arrive, and the realistic options for who assembles them.
Delivery is scheduled against the install sequence, not against the truck's convenience: the kits for the first assemblies arrive first, and larger projects can stage deliveries so the site is never buried in material it cannot use yet.
Kits ship from the facility serving your territory (see the territory map). Delivery scope — to the site, to a staging point, in how many drops — is defined in the project agreement, not improvised at the gate.
Access for delivery vehicles, a staging area that keeps kits organized and off the ground, and a foundation that is complete and verified before panels land. A crew standing around a not-ready site burns the schedule the system is meant to protect.
Assembly can sit with your own framing crew, with a framing-crew partner who works in the system, or somewhere between — the right answer depends on your team's experience and the project. Responsibility lines are the subject of the installation page.
Against the install sequence and the site's readiness date — with the serving facility and freight realities in view. Dates are commitments the project plan makes, not hopes.
Numbered, grouped, and documented. The receiving check is simple by design: kit numbers against the delivery paperwork, before the truck leaves if at all possible.
Kits are staged so the sequence survives contact with a real site: first assemblies accessible first, components protected from site damage.
The crew assembles from the model documentation — numbered components, planned connections — and the frame rises as assemblies, not as a thousand individual decisions.
Three honest dependencies. Distance: freight from the serving facility is a real cost and a real schedule factor — territory is not a footnote, which is why the facilities map is on this site and why it changes as new plants open. Site conditions: access, ground, weather windows, and equipment needs (some assemblies want a lift or a crane; some do not) are project specifics that get named in planning, not discovered on delivery day. Crew readiness: a crew new to the system assembles its first project differently from its fifth — training and support options for first projects belong in the fit conversation, asked about directly.
None of that is a reason for vagueness. It is a reason the project agreement should say, in writing: what ships, from where, in how many drops, to what point, against what readiness conditions, and who assembles with what support. If a proposal you are comparing leaves those lines blank, that is information too.
Yes — staged delivery matched to the install sequence is a normal pattern for larger projects, and it keeps the site workable. The staging plan is part of the delivery scheduling conversation.
It depends on the assemblies in scope and the site. Panelized work may call for lifting equipment; component assembly is lighter. The equipment conversation happens in planning, against your actual model.
Delay and rescheduling terms live in the project agreement. Ask for them explicitly — a system built on scheduling should be able to talk about schedule risk plainly.
Same intake NexGen runs on its own site: who you are, and the parameters of the build. Plans can ride along right here.
The hosted project form isn't wired to this page yet, so there's nothing to send from here. Book a discovery call and we'll take your project details live.
Book a discovery callEvery item from the comparison overview, with its own page.
How plans become a fabrication model and modeled components.
Read the page →Explore 02What wall, truss, and floor-system scope can include.
Read the page →Explore 03Pre-punched, numbered components organized for the install sequence.
Read the page →Explore 04How kits reach the site and what assembly options look like.
You are hereConfirm 01Who engineers, who stamps, and who approves what.
Read the page →Confirm 02Local code and permit questions to settle early.
Read the page →Confirm 03Who installs, and what timing depends on.
Read the page →Confirm 04How quoting works, exclusions, warranties, and where projects can be served.
Read the page →Send the plan set and the project details — the fit conversation works through scope, engineering, and the right next step for your building.